Map pin 1 · Mar Vista, Los Angeles · AIH Development
Mountain View Avenue
Glass, pale plaster and timber, lifted above the street with city views from the back
AIH Development's fifth house with us, and the first with a film. Peggy Hsu supplied the drawings, and the nine stills and the animation were refined with the developer until every view matched the design exactly; the final set was approved in March 2026. Hsu McCullough lists a 4,793 sq ft house with a 1,109 sq ft ADU and a pool, in construction with completion expected in late 2026, and credits the renderings to NoTriangle Studio.
Under construction. Rendered 2025 to 2026. Under construction (Sept 2026), with completion expected late 2026. See the project on Hsu McCullough's site.
The film
The one-minute film for AIH Development: the street front, the pool, the main rooms, the primary suite and the ADU
















































